Динамика мостового крана. Часть 2. Моделирование процесса подъема груза с постоянной скоростью

Сладковский, А. & Ханишевский, Т. & Матыя, Т.

(In Russian)
Dynamics of the bridge crane. Part 2. Simulation of the process of lifting the load with a constant speed
Sladkowski, A. & Haniszewski, T. & Matyja, T.


PDF
210a.pdf

Go back

News

Scientific seminars at the Department of Logistics and Transport Technologies

2019-02-11

When analyzing the scientific activities of the Department of Logistics and Transport Technologies, we can note, that December 2018 - January 2019 were one of... more

Conference in Oswiecim

2019-01-18

On January 17 at the State Higher Vocational School named after captain W. Pilecki in Oswiecim, a conference entitled "Management and production engineering in... more

Continuing cooperation with the University of Zilina

2019-01-11

One of the closest geographically to Katowice universities is the University of Zilina (Slovakia). Traditionally, scientists of the Silesian University of... more

The visit to Almaty

2018-12-25

In November - December 2018, prof. Aleksander Sładkowski once again visited Kazakhstan. This trip was connected with the cooperation of the Silesian University of... more

Grey_189a Grey_160a2 Grey_172a Grey_190a Grey_216a2 Grey_207a3 Grey_168a Grey_216a
Grey_230a Grey_192a2 Grey_187a Grey_214a Grey_192a3 Grey_207a2 Grey_152a Grey_224a2